Well, it wasn't the weekend I had planned earlier in the year, but it turned out to be a good one. Friday my husband emptied our small walk in closet, fixed all the shelves, we each went through our things and tossed a lot of junk and we again have a usable closet. He also put some shelving over his dresser to more easily store some things.
Wednesday, November 25, 2009
Hunting Weekend Wrap Up 2009
Thursday, November 19, 2009
Hunting Weekend....sort of. And a Challenge Update
My husband and two older sons are on their way to where they meet up with a few other guys for their 6 hour drive north.
Amvets is coming tomorrow so we cleaned out a bunch of closets and drawers. The big project of the weekend is redoing our closet. The organizer is falling apart (it's 25 years old) and he's basically pulling everything out, repairing or replacing what he needs to and then putting it all back together again. I actually went through a lot of my stuff already and hopefully by the end of the weekend we'll have a more functional closet (I've barely been using it for some time now.)
Here is the posy basket, holding all the matches, some of the leaves (there are still more to be cut), and the threads needed for sewing.
All in all, life is good. Everyone is happy and healthy, we're headed into this holiday season much less stressed than the last couple of years and for that I'm very thankful!
And now it's time to run, my sewing is calling me and I need to take advantage of every minute I can find.
Happy Quilting!
Sue
Sunday, October 11, 2009
Over the Tops - Moving Along
My intention was to update more often than I have been of late, but I've been so busy that it's been easy to put it off. Fortunately, even among the busy-ness, I've been able to spend some time on my challenge projects.
It seems as if this one is going to go pretty quickly and I love the border design so am anxious to get to it.
Sometime in the next week or two I'll be marking the flying geese quilt, it will go into the hoop next. I'll also be having a few small Christmas gift projectsto do along the way, but I'm determined to keep a big project in a hoop as much as possible.
The challenge project that has gotten quite a bit of attention in the last few weeks is the posy and celtic quilt. I'm really, really happy with how this is coming out. Here are the last of the flowers and leaves to be added along with the yo-yo maker I've been using and the stack of fabrics that are being used for the yo-yos.
I hope to spend quite a bit of time quilting this week and plan to get a good bit of Debbie's quilt done and I would like to also get a fair portion of the vine/leaf/posy part of the border done. I should also do something on another challenge project, I haven't decided which it will be, yet.
I came out of the kitchen one day to find Ruthie laying on her belly watching the TV downstairs, which is a half flight down.
My family is pretty busy tomorrow, so I should have a lot of sewing time. I'm making one of our favorite meals for dinner, boiled spareribs with sauerkraut, mashed potatoes and rolls cooked on top of the boiling pot. They will all be outside for a good part of the day and this is a perfect cold weather meal. Thankfully it's also a rather low maintenance meal while cooking, so it should leave me plenty of down time.
Happy Quilting!
Sue
Monday, September 21, 2009
Over the Tops - First Update
These last couple of weeks have been much busier than I ever expected, but in spite of that I've been able to make some progress on a couple of my challenge projects.
To complicate things, I badly cut my left index finger on Saturday, while preparing for our Football and Food Fest day yesterday, rendering it pretty much useless for at least the next several days. Typing while watching the keys and substituting fingers REALLY slows one down when one is used to not looking at all! This was supposed to be a decidedly less busy week, but I'm now babysitting 3 afternoons and Rachel's algebra is taking us a couple of hours a day...add that to a gimpy left hand and I won't get nearly as much accomplished as I'd hoped, then again, just not having to leave the house except to grocery shop sounds pretty darn good in and of itself.
While the Purple Paper Pieced quilt isn't on my challenge list, I still want it to be finished before putting anything else in the hoop. I was on a roll until I hit the outer border, which is more tedious to quilt than I expected. I'm still going to quilt at least a little bit on it each day and will get back to it full force when my finger is more useful, for now having to do everything altering the position of my hand is really slowing me down.
I've spent a fair amount of time on two of the projects. The first is the Posy and Celtic quilt (which probably needs a new name, while the applique is done in the way celtic applique is done, it turns out that none of the designs are really celtic style designs.) I finished sewing the second side down to all the pieces in the sashing. I was still stumped as to what to do in the outer border.
I thought about and discarded several ideas. I felt like it needed some kind of braid in that outer border to "complete" the sashing braid. Just the braid didn't seem like enough, though. I finally drew out a design and laid it along the edge.
I had planned to put the braid in closer and then a vine and posy border outside of that. When I first planned this quilt, the outer border was to be a vine and posy border, but as I worked on the quilt, that idea changed. I laid this paper pattern up next to the top and it didn't seem to work. The braid alone wasn't enough, the vine seemed superfluous when on the outside.
In moving the top and border pattern around, one time it ended up with the vine border inside and the braid border outside. That was it! It looked complete with that braided border on the outside. I added the border strip and marked it all, and started to sew on the vine.
The other project that got a lot of attention is Radiating Rainbows. I cut 13 sets of blocks, and set up my applique box with all the thread needed, spare needles and a pair of scissors. If I need a takealong project, I can just pick up this box and go.
Each baggie has all the pieces to make 4 blocks as there are 4 of each color combination. This should keep me going for a while and once they are done I can lay them out and see what combinations are needed to balance out the colors in this top. Here is a finished block.
And of course, no post is complete without a Ruthie picture. Drawing is SO exhausting!
So now it's time to get to the quilting. Laundry is going, algebra is done, a bit of kitchen cleaning and picking up will fill in the times when I need to get up and move around a bit. Hopefully I'll et more sewing done than it seemed I would first thing this morning!
Happy Quilting!
Sue
Tuesday, September 8, 2009
"Over the Tops"....a quilting challenge
I've been able to think of little else but my quilting challenge since my last post and have spent much of that time planning it out.
I decided that it needed several facets. Part of the challenge is the amount of projects I'd like to see completed by the end. My official start date is today, September 8, 2009, and the official ending date is December 31, 2010.
I guess the easiest way to do this is to just list off the projects and include any "why they are included" information in their description. The projects aren't listed in any particular order, and won't be completed in any particular order.
1. This is a very old project. Started for my husband's 40th birthday, this got side-lined for many different reasons. I started thinking about it again when two different things happened. The first was that I found the poem I wrote to go on the back of the quilt. The other was my husband's innocent "you don't have a need for an overhead projector, do you?" Many times over the years, I had wished I had one, when I had a pattern that needed to be enlarged. I told him that most definitely yes, I could use one and he's watching out for one (he works at the local high school and they often throw out equipment when it's been replaced with something better, even if it's still in working order.) This is a hand pieced project, it's a castle with a moat and surrounding grounds. Hanging out one of the "windows" will be the damsel (me) and coming up on a white horse will be a knight in armor (my dh). The plan will be to get this top done, quilted, and bound.
2. Posies and Celtic Quilt.This is one that I really didn't want to end up as a "UFO." I need to finish the applique in the sashings (this is nearly finished), design and add the borders, and quilt it.
I've been looking at this pretty basket full of fabric for a few weeks now, and part of me hates to cut into it...part of me can't wait.
So there it is. Eight projects officially in my challenge, though I know that I also have to finish the purple quilt, quilt Debbie's quilt, make a few other small Christmas gifts, and of course there will be at least one Christmas gift quilt for next year and possibly a wedding quilt. Yikes.
For now, I'm focusing on what's in front of me. The purple one is a big priority, as nothing else will go into the hoop until it's finished. I'm not quite sure how I'll "schedule" the others, at first I'll be picking what I feel like doing each day. At some point, I'll likely settle into a couple at a time to focus on.
It's already late today and after a busy weekend and a much busier day today than I had planned, I still have dishes to do. Once they are done, though, I will have actually accomplished just about everything I needed to in order to make tomorrow a mostly sewing day. I'm looking forward to spending some time on at least a couple of these projects!
Happy Quilting!
Wish me luck!
Sue
Sunday, September 6, 2009
Musings, Updates, and Ruthie
I saw the movie "Julie & Julia" yesterday. My husband surprised me the night before, asking what was going on the next day. He often asks, to find out what's up with all of the kids for the weekend, but I could tell there was something different. When I finished the rundown of who would be where, I asked why. He said he wanted to take me to a movie. We haven't been to a movie together since "Sleepless in Seattle" came out. Generally, if we have the time and money to go out, we go out to dinner so we can talk, but he knew I really wanted to see this movie.
Monday, August 17, 2009
Summer is Winding Down
Our first day of school is the day after Labor Day. Our local schools start today, but we home school so can pick our start date. We enjoy these last couple of weeks of summer very much and this year it's much cooler than usual for the middle/end of August and that is just adding to the pleasure of these days.